Most brownstone owners in Brooklyn eventually face the same realization.
You plug in a modern appliance or a space heater, and the lights flicker.
This isn’t just a quirk of living in a historic home.
It is a warning sign from an electrical system that was never designed for the 21st century.
We have seen hundreds of these beautiful 19th-century buildings struggle to keep up with modern demand.
The original wiring often dates back to the 1920s or earlier.
Rewiring a Brooklyn brownstone is one of the most significant investments you will make.
It is also the only way to ensure safety and insurance compliance.
This guide breaks down the data, the costs, and the specific process required to bring your home up to code.
When Does a Brownstone Need Rewiring
You might be wondering if a full replacement is actually necessary.
Partial updates are sometimes an option, but specific conditions usually force a homeowner’s hand.
We often find that insurance carriers drive this decision more than anyone else.
Many insurers, such as Travelers or Chubb, are increasingly sending non-renewal notices to homes with active knob-and-tube wiring.
The risk of fire is simply too high for their underwriting standards.
Beyond insurance pressure, there are physical indicators that the system has reached the end of its life.
- Knob-and-Tube Wiring: This system lacks a ground wire. The rubber insulation used on these wires becomes brittle and crumbles off after 60 to 80 years, leaving live copper exposed inside your walls.
- Cloth-Sheathed Wiring: Common in the 1940s and 50s, this ungrounded cabling is often undersized for modern electronics.
- Aluminum Wiring: If your home was renovated in the late 1960s or early 70s, it may have aluminum branch wiring. This material expands and contracts differently than copper, leading to loose connections and potential arcing at outlets.
- The Renovation Opportunity: If you are opening walls for a kitchen or bath remodel, NYC code often mandates bringing the exposed circuits up to current standards.
Planning Your Rewiring Project
A successful project relies entirely on what happens before the first wall is opened.
We start every project with a load calculation to ensure your new service can handle future needs.
This is particularly important with New York’s push toward electrification under Local Law 97.
Your plan needs to account for heavy-draw appliances that didn’t exist when the house was built.
- Service Capacity: Determine if you need 200 amps (standard) or 320/400 amps (for electric heating and vehicle charging).
- Circuit Mapping: Identify where you need dedicated 20-amp circuits for high-wattage devices like hair dryers or espresso machines.
- Structural Routing: Brownstones have unique anatomy, including thick masonry party walls and fragile plaster lath.
An experienced electrician maps these routes to minimize damage.
We look for existing chases or plumbing stacks that can serve as conduits between floors.

The Rewiring Process Step by Step
Rewiring an occupied brownstone is a surgical process.
We typically estimate a timeline of 5 to 10 days for a standard triplex, depending on access.
Day One: Protection and Panel Setup
The first priority is protecting your home’s finishes.
Floors are covered with Ram Board, and furniture is sealed in plastic to protect against plaster dust.
Our team then focuses on the basement or cellar to establish the new main service.
The old electrical panel is disconnected and removed.
A new 200-amp (or larger) breaker panel is mounted, grounded to the water main, and bonded according to Con Edison specifications.
Days Two Through Five: Fishing the Wires
This phase involves the most labor and technical skill.
Technicians run new NM cable (Romex) or armored cable (MC) from the panel to every room in the house.
We use long, flexible drill bits and glow rods to “fish” wires behind walls without tearing them down.
This technique is essential for preserving the lathe and plaster characteristic of Brooklyn homes.
Small, circular access holes (roughly 4 inches in diameter) are cut near the ceiling and floor to guide the wires.
Days Six Through Eight: Device Installation
Once the cabling is routed, the “rough-in” phase is complete.
We then install the new receptacles, switches, and lighting fixtures.
This is also when we install Arc-Fault Circuit Interrupters (AFCIs) and Ground-Fault Circuit Interrupters (GFCIs) as required by code.
Final Phase: Testing and Patching
Every circuit is energized and tested for polarity, grounding, and voltage drop.
We label the panel clearly—no vague “General Lighting” labels, but specific descriptors like “2nd Fl Front Bedroom.”
The final step is patching the access holes.
While electricians typically leave walls ready for paint, some contracts include rough plaster patching.
NYC Permits and Code Requirements
You cannot legally rewire a brownstone in New York City without a permit.
The NYC Department of Buildings (DOB) maintains strict oversight on electrical work.
We handle the filing of the electrical application, which must be signed by a licensed Master Electrician.
Essential Code Mandates for 2026
The current NYC Electrical Code includes specific safety requirements that older homes lack.
- Tamper-Resistant Outlets: All receptacles must have internal shutters to prevent children from inserting objects.
- AFCI Protection: Almost all living areas (bedrooms, living rooms, hallways) require Arc-Fault protection to detect dangerous sparking.
- Dedicated Kitchen Circuits: The code requires two 20-amp “small appliance” circuits for kitchen counters to prevent breaker trips.
- ACP-5 Requirement: For buildings constructed prior to April 1, 1987, an asbestos assessment (ACP-5 form) is often required before the DOB issues a permit for work that disturbs walls.

Preserving Your Brownstone’s Character
Owners often fear that rewiring means destroying their historic interior.
This fear is understandable, but modern techniques make it largely unfounded.
We utilize low-damage methods specifically for landmarked or historic properties.
Wireless Solutions for Historic Walls
Minimizing cuts into brick or delicate plaster is the goal.
Lutron Caseta and similar smart lighting systems allow us to install a switch without running a switch leg inside the wall.
The “switch” is actually a remote mounted to the wall surface, communicating wirelessly with a module at the fixture.
This saves the plaster from being channeled out for wires.
Floor Outlets
Refinishing floors is often easier than repairing custom plaster molding.
We often recommend installing brass floor boxes for outlets in living rooms.
This avoids the need to channel into the party walls, which in brownstones are often solid brick directly behind the plaster.
Cost Expectations for Brooklyn Brownstones
Budgeting for this project requires realistic expectations for the New York market.
A complete rewire is labor-intensive, often requiring two electricians and a helper for a full week or more.
The price of copper and electrical gear has also risen significantly in the last two years.
Estimated Cost Breakdown (2025/2026 Rates)
| Home Size | Scope of Work | Estimated Cost Range |
|---|---|---|
| Garden Apartment | 1-2 Bed, standard finish | $12,000 - $18,000 |
| Duplex | 2-3 Bed, panel upgrade | $22,000 - $30,000 |
| Triplex/Fourplex | Whole home, high-end fixtures | $35,000 - $55,000+ |
These figures include permits, labor, materials, and the main panel.
They generally do not include the cost of repainting or repairing the plaster access holes, which is usually done by a separate general contractor or painter.
Combining Rewiring With Other Upgrades
Opening your walls presents a unique window of opportunity.
It is far cheaper to run additional lines now than to call us back in two years.
We recommend considering three specific upgrades during the rewire process.
1. HVAC Preparation
If you plan to install mini-split heat pumps, run the 220-volt lines to the roof or backyard now.
This allows you to install the units later without exterior conduit ruining your façade.
2. Electric Vehicle (EV) Charging
Even if you don’t own an EV, a future buyer likely will.
Running a 50-amp circuit to the front area or backyard adds significant resale value.
3. Data and Coax Hardlines
Wi-Fi is great, but hardwired Ethernet (Cat6) is superior for home offices.
We can pull these low-voltage cables alongside the electrical lines for a stable, high-speed connection on every floor.
Choosing the Right Electrician
The technical skills required for new construction differ vastly from retrofit work.
You need a team that understands the structure of a timber-framed, masonry-walled 19th-century building.
We have rewired hundreds of Brooklyn brownstones and understand the nuances of working in occupied historic homes. Learn more about our wiring and rewiring services.
A qualified electrician should be able to provide their NYC Master Electrician License number immediately upon request.
They should also be familiar with filing for inspection with the Bureau of Electrical Control.
Our team focuses on safety, minimal disruption, and respecting the architectural legacy of your home.
If your lights are flickering or your insurance company is asking questions, it is time to have a conversation about your wiring.
Related Service
Learn more about our wiring rewiring service